WP3 roles

Role of partner:

WP3 will be coordinated by GUC.

Responsible for the lead of Task 3.1 is SINTEF RM. GUC, RD&T, C3M and NTNU will contribute to Task 3.1.

Task 3.2 will be led by GUC. SINTEF RM, RD&T, C3M, UTC and NTNU will contribute.

Task 3.3 will be coordinated by GUC. SINTEF RM will contribute.

Task 3.4 will be led by RD&T. SINTEF RM and C3M will contribute.